99精品久久99久久久久,亚洲国产成人精品无码一区二区,国产精品亚洲综合色区韩国,久久精品第一国产久精国产宅男66

Infrastructure Under-construction on PPP Basis – National Highway G206
ACEG Invest.  |  Updated: 2018-01-30  |  Views: 37285

The National Highway G206 Shucheng Section is with a length of 23.1KM starting from the Interchange Overpass named Shuqing in Shucheng County and ending at the boundary with County Tongcheng .

The designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

The initial shareholder of this project is Tongyun Transportation Construction Investment Co., Ltd. in Shucheng County, accounting for 20% of the shares and the social capital - Anhui Construction Engineering Group Co., Ltd. accounting for 80% of the shares.

The total investment of the project is RMB 840 Million Yuan and the construction cost is RMB 688.5 Million Yuan. The total construction period is 18 months and the operation period is 10 years.

The project commenced in January 2017 and the scheduled completion date will be in July 2018.

 

孝昌县| 镶黄旗| 清水县| 灌阳县| 贵阳市| 中江县| 金塔县| 丽江市| 青河县| 辽中县| 庆云县| 广西| 锡林郭勒盟| 日照市| 博白县| 乳源| 凉城县| 石泉县| 柘荣县| 望江县| 镇平县| 镇赉县| 万载县| 伊川县| 饶平县| 丹东市| 海原县| 祁连县| 灵山县| 太仆寺旗| 沛县| 鲁山县| 攀枝花市| 琼结县| 石门县| 海淀区| 盐池县| 阳江市| 东阳市| 佛学| 商丘市|

<span id="py1xd"><listing id="py1xd"></listing></span>

    <label id="py1xd"><big id="py1xd"><tbody id="py1xd"></tbody></big></label>

  1. <li id="py1xd"></li>
    <rt id="py1xd"><delect id="py1xd"><style id="py1xd"></style></delect></rt><li id="py1xd"><legend id="py1xd"></legend></li>